Goods will take 5 to 10 days to clear at Lekki Port – Operator

The container terminal operator for the Lekki Deep Sea Port- Lekki Freeport Terminal, a subsidiary of the CMA/CGM Group, has assured shippers of a faster turnaround time for the clearance of goods from the Port, stating that it will take between 5 to 10 days which is fastest compared to what is currently obtainable in existing ports across the country.

“We have executed significant barge moves between Ikorodu and Kirikiri. We have done over five barge moves totalling 900 Twenty-foot Equivalent Units of containers (TEUs). We also believe this would allow Lekki Port to play a role in cargo uptake using Eastern ports of Calabar, Onitsha, and Warri,” he added.