The minister spoke in Lagos while on an inspection tour of the three bridges linking Lagos Mainland with Victoria Island, including the ongoing rehabilitation works on the first section of the 3rd Mainland Bridge.
It was gathered that the project which has a total cost of N25 billion is being handled by Julius Berger.