LEADERSHIP gathered that contractors are unable to commence road beautification due to indiscriminate dumping of waste along the axis by residents of the area.
According to the Federal Ministry of Works and Housing (FMWH), the poor waste disposal mechanism along the road affected the proposed beautification of the corridor which was in the original master plan of the construction work as executed by Messrs. Dangote Limited.
Speaking during joint inspection of the corridor, over the weekend, the Port manager, Nigerian Ports Authority (NPA), Tin-Can Island Port Complex(TCIPC), Mallam Buba Jubrin, bemoaned indiscriminate dumping of refuse on the dual carriage way.